Two new 5-story bed towers and the associated base diagnostics and testing (D&T) support. The project also includes a new Central Utility Plant building and loading dock/service entrance totaling 23,000 square feet.
- Inspected and tested all required OSHPD TIO program items.
- Inspected all structural steel being fabricated at Gayle Manufacturing in both Woodland, California and Boise, Idaho.
- Inspected all Buckling Restrained Braces (BRB) that were fabricated at Yajima-USA located in Reno, Nevada.
- Performed water and air infiltration testing of windows, storefronts, curtain walls and skylights.
DURATION: 2008 – ONGOING
CONSTRUCTION COST: $300M