ELLIS CREEK WATER RECYCLING FACILITY

PETALUMA, CALIFORNIA

Atlas provided inspection from the grading of this massive site through the erection of structural steel and pouring of the final yards of concrete. This $115 million wastewater and treatment plant included administration and operations buildings, tanks and retention ponds. Atlas worked closely with The Covello Group to monitor and control construction costs.

  • Steel fabrication in Mexico.
  • Resident inspector onsite full-time.
  • Specialized laboratory testing.

CLIENT / OWNER: THE COVELLO GROUP
DURATION: 2005 – 2008
CONSTRUCTION COST: $115 MILLION

Skills

Posted on

December 19, 2017