Atlas provided materials testing and special inspection testing on this massive 320-acre site development. This campus includes 48 one and two-story buildings that total over 1.2 million square feet. Atlas mobilized 13 inspectors onsite within 48-hours notice to accommodate this fast-track schedule.
- Full-time quality control manager working closely with the construction management team.
- Onsite certified laboratory performing all lab testing.
- Structural steel fabrication in 6 different locations.
DURATION: 2003 – 2005
CONSTRUCTION COST: $400 MILLION